The goal of the reconstruction was improvement of technical condition of existing railway infrastructure in the section between railway stations Palarikovo and Nove Zamky, namely the track sub- and superstructure, electronic devices and energy devices. The project consisted of the reconstruction of tracks No.1 in the length of 7 691 m, track No.2 in the length of 7 778 m as well as the exchange of traction line. In the location of 139,083 rkm the level crossing was reconstructed and new level crossing signaling was installed. At Ludovitov halt, the track No.1 and No.2 platforms were reconstructed, including the respective ramps and lighting. The project also included the modification of railway bridge at 143,696 rkm, that was encompassing the changes and rehabilitation of support and base parts of the bridge. During the construction the cable lines were modified and affected infrastructure lines were relocated.