The reconstruction involved the replacement of manual switches, which were in poor technical condition. A total of 16 electromotive switches and more than 30 signals were deployed. The detection of rolling stock was ensured by means of axle counters, of which a total of 37 pieces were deployed. The reconstruction also included the construction of a new operator's workplace and the installation of electronic interlocking system technology.
Ferona
Národná dialničná spoločnosť
VÚJE
PSA groupe
Mesto Senica
Vodotika
Slovnaft
ŽSR
DANUCEM
CONTACT